Vasani Polymers

vasani-logos

uPVC UGDS Pipes

Product Brief

  • HSN Code : Pipes- 39172390
  • Material: Unplastisized Poly Vinyl Chloride (uPVC)
  • Pressure Rating: SN 2, SN 4 & SN 8
  • Size: 63 mm to 400 mm
  • Standard: IS 15328 – 2003
  • Colour: Orange
  • Form Supplied: Elastometric sealing ring type pipe with 6mtr. length.

uPVC UGDS Pipes

uPVC UGDS Pipes

Advantages

Highly Durable

Corrosion Resistance

Flexibility

Non-Toxic

Lightweight

Earthquake Resistant

Eco friendly

Technical Details

Jointing​

For Selfit Pipe

Measuring

Measure the required length of pipe and marking done.

Cutting

Cutting The pipe must be cut in a square shape. The base of the fitting socket needs a rubber ring to seal it, since an angled cut may result in leakage.

deburring-&-chamfering

Deburring & Chamfering

 All the burr must be removed from the inside and outside of the pipe with a knife, file or de-burring tool. A 10° – 15° chamfer must be made at the end of the pipe.

cleaning

Cleaning

The surface dirt, grease or moisture must be removed with a clean dry cloth.

Solvent Cement Application

An even layer of cement should be applied to the outer side of the pipe and a medium layer of the plumbing solvent cement to the inside of a fitting.

Assembly

Join the pipe and fitting socket till in contact with the socket bottom. Hold the pipe and fitting together until the pipe does not retract. The excess cement can be removed from the exterior surface of the pipe and fitting. A properly made joint will show a continuous bead of cement around the perimeter of the pipe and fitting.

For Ringfit Pipes

cleaning

Cleaning

The surface dirt, grease or moisture must be removed with a clean dry cloth.

rubber-ring-fitment

Rubber Ring fitment

Take rubber ring & clean for surface dirt of any & insert in pipe groove by hand.

cutting

Cutting

he pipe must be cut in a square shape. The base of the fitting socket needs a rubber ring to seal it, since an angled cut may result in leakage.

chamfering-and-cleaning

Chamfering and cleaning

The surface dirt, grease or moisture must be removed with a clean dry cloth. A 10° – 15° chamfer must be made at the end of the pipe.

lubricant-application

Lubricant application

Apply lubricant even layer on rubber ring prior to insertion.

assembly

Assembly

Push the pipe in integrated ring socket end.

Open chat
Vasani Polymers
Hello 👋
Can we help you?